Yes = Yes    No = No    Maybe= Maybe

Project Size (tons) 420D 525D 945D 195I
< 1,000
1,000 - 10,000
10,000 - 30,000
> 30,000

Contaminants 420D 525D 945D 195I
Petroleum Hydrocarbons - Light (BTEX & gasoline)
Petroleum Hydrocarbons - Medium to Heavy
Chlorinated Solvents < 25 ppm
Chlorinated Solvents >25 & < 250 ppm )
Chlorinated Solvents >250 ppm
PCBs (Aroclors)
Pesticides


The above table should only be used as a guide. There are many factors that determine which thermal system is best suited for a particular site, and permitting is always a factor. A particular thermal treatment system may be technically capable of meeting the remediation goals, but may not be accepted by the appropriate regulator.

Follow Me

Low Temperature Thermal Desorption Systems

420d

420D                                                                                                       Learn More +
Applications VOC, CVOC, SVOC, Pesticides, PAH
Primary Technology Direct Fired Continuous Feed
Secondary Technology Thermal Oxidizer w/ Optional Quench & Scrubber
Max Process Rate 15 Ton per Hour
Average Process Rate 8 – 12 Ton per Hour
Foot Print 75’ x 50’
Setup Time 2-3 days
Advantages Treats High Chlorine Content Soils

525d

525D                                                                                                       Learn More +
Applications VOC, CVOC, SVOC, Pesticides, PAH
Primary Technology Direct Fired Continuous Feed
Secondary Technology Thermal Oxidizer w/ Optional Quench & Scrubber
Max Process Rate 25 Ton per Hour
Average Process Rate 14 – 18 Ton per Hour
Foot Print 70’ x 30’
Setup Time 2 days
Advantages Medium Capacity 2 - Load Unit with Stainless Steel Drum

945d

945D                                                                                                       Learn More +
Applications VOC, CVOC, SVOC, Pesticides, PAH
Primary Technology Direct Fired Continuous Feed
Secondary Technology Thermal Oxidizer w/ Optional Quench & Scrubber
Max Process Rate 25 Ton per Hour
Average Process Rate 14 – 18 Ton per Hour
Foot Print 70’ x 30’
Setup Time 2 days
Advantages Medium Capacity 2 - Load Unit with Stainless Steel Drum

195i

195I                                                                                                       Learn More +
Applications VOC, CVOC
Primary Technology Indirect Fired Batch System
Secondary Technology Condense & Recover
Max Process Rate 10 Ton per Hour
Average Process Rate 3 – 6 Ton per Hour
Foot Print 50’ x 20’
Setup Time 1 day
Advantages Easily Permitted, and Ideal for the Treatment of Soil Containing Hazardous Chlorinated Solvents